:::: MENU ::::
Showing posts with label Biogas Construction Process. Show all posts
Showing posts with label Biogas Construction Process. Show all posts

Paper presented at the Biogas Training Programme Conducted at CARD,
Alam Village, Myitkyina.
Metta Development Foundation

Biogas Construction Process

Govinda Prasad Devkota
P.O. Box 20506 Kathmandu, Napal
govindadevkota@yahoo.com.

Introduction:

The success of the plant depends upon the construction. In this paper the construction process of the fixed dome design biogas plant developed by Gobar Gas Company in Nepal is presented.
 

Measurement of different size of biogas plants:

Part of the plant
Plants size in Cubic meter
4
6
8
10
15
20
A
140
150
174
180
248
264
B
120
120
130
125
125
176
C
135
151
170
183
205
233
D
50
60
65
68
84
86
E
154
155
172
168
180
203
F
102
122
135
154
175
199
G
185
211
221
240
261
288
H
86
92
105
94
115
115
I
112
116
127
124
132
137
J
151
110
175
171
193
203

Note: All the measurements are given in Centimeter.


Recent Posts

Related Posts Plugin for WordPress, Blogger...

Followers

Featured Posts