Biogas In Pakistan

Source : http://paksc.org

Pakistan has low forest cover. About 4% of total area is covered by forest, in which only 5% area is protected. 90% of country’s wood production is used as fuel. About 7000 ha of land is reforested in Pakistan every year. To control reforestation adoption of biogas is a best technology in Pakistan. Biogas technology has proved to be very successful in Pakistan. These activities will not only be beneficial to the human health but will also have positive impact on the environment
Biogas is produced by mixing dung (Animal waste) and water in the absence of oxygen through fermentation process. Biogas can provide a clean, easily controlled source of renewable energy from organic waste materials for a small labour input, replacing firewood or fossil fuels (which are becoming more expensive as supply falls behind demand). During the conversion process pathogen levels are reduced and plant nutrients made more readily available, so better crops can be grown while existing resources are conserved.
Composition of Biogas

  • Methane, CH4                              50-75%
  • Carbon dioxide, CO2                   25-50%
  • Nitrogen, N2                                 0-10 %
  • Hydrogen, H2                               0-1 %
  • Hydrogen sulphide, H2S              0-3 %
  • Oxygen, O2                                  0-2 %

Composition depends upon the material feeded and process nature


Source :http://www.slbap.org/


A.   Uses of Biogas.

·         For cooking and heating food.
·         For playing fan in summer.
·         For lighting.
·         Organic manure is its bye product.

The sludge product of anaerobic decomposition produces a better fertilizer and soil conditioner than raw manure. It nitrate e.g.  nitrogen, phosphorous, potassium, plus trace elements.

B.   Selection Criteria of Beneficiaries.

·         The plant will be allotted to individual household.
·         Land for construction of bio-gas plant should be available free of cost.
·         Enough water should be available for feeding purposes.
·         The individual household should have two buffaloes, preferably.
·         Direct sunshine should be there throughout the day time on the proposed site.
·         From environmental point of view, the plant should be out side of the boundary wall of the house. Plant should away  50 feet  from kitchen.
·          

C.   Location:

The most important consideration is the location of the plant.

·        DO NOT dig the digester pit within 13 meters of a well or spring used for drinking water.
·        If the water table is reached   when digging, then site should be changed or it will be necessary to cement the inside of
the digester pit.
·        Try to locate the digester near the stable excessive time is not spent transporting the manure because fresher manure produce more methane.
·        Be sure there is enough space to construct the digester. For 3 cubic meters of methane requires an area approximately 2 X 3 meters.
·        Arrange to have water readily available for mixing with the manure.
·        Plan for slurry storage. Although the gas plant itself takes up a very small area, the slurry should be stored either as is or dried. The slurry pits should be large and expandable.
·        Plan for a site that is open and exposed to the sun. The digester operates best and gives better gas production at high temperatures (35degrees)
·        Locate the gas plant as close as possible to the point of gas consumption. This tends to reduce costs and pressure losses in piping the gas. Methane can be stored fairly close to the house as there are few flies or mosquitoes or odor associated with gas production.

F. Design parameter:
i) Required Manure :
            One buffalo can produce about 20 to 22 kg manure per day. Average 4 No cows or 2 No            
            buffalos will produce about 45 kg manure per day .05 cubic meter. 

The ratio of manure and water is 1: 1.
45 kg manure + 45 kg water = 90kg
Total input per day  = 90 kg
Input for 5 weeks = 90 kg X 35 days = 3150 kg
1000kg = 1 cubic meter
3150 kg =3.1 cubic meters

So for a single household of average 7 people living is 3 cum plant is recommended
ii)  Temperature: Normally required temperature will be  20o c to 35 o c
iii) PH value: Neutral PH and ranges 6.8 to 7.2

G.  Construction Materials (For 3-Cubic-Meter Digester)

·         Bricks approximately 2700
·         Cement, 11 bags.
·         Sand, 74 cft.
·         Crush 9 cft.
·         Steel sheet for gas cap 20’x4’ of 16 gauge.
·         RCC pipe of 6 inch diameter,12 feet.
·         Angle iron 2 inch,10 feet.
·         Mild steel rods, approximately 18. feet (for bracing)
·         GI pipe  ½ inch dia, and fitting as per requirement.
·         Plastic pipe  ½ inch dia, as per requirement.
·         Stove 1 No.
·         Waterproof coating (paint, tar, asphalt, etc.), 4 liters (for  gas cap)

H.X- Section of 3M^3.
 
  1. Design/Construction.

·         Prepare foundation.
·         Dig a pit 6.5 fee in diameter to a depth of 12 feet
Line the floor and walls of the pit with bricks and bound it with cement mortar with the ratio (1:5)
    
·         Put RCC pipe of 12 feet length from ground have one end of the input piping 3.5 feet above ground level and the other end 2 feet above the bottom of the pit.
·         Keep angle iron on the brick wall about 8 feet height from the floor on three sides  for the gas cap to rest on when it is empty.
·         Extend the brickwork up to  1 feet above ground level to bring the   total depth of the pit to approximately 12 feet.
·         Plaster inside the plant with the ratio (1:4)
·         Provide additional support for the pipe by fabricating across brace made from mild steel. 


J. Design of Gas Cap Drum

            The metal drum serving as a gas cap covers the fermentation tank and is the most expensive single item in the whole plant. The drum is made to hold between 60 and 70 percent of the volume of the total daily gas production. Usually drum from mild steel sheeting or galvanized iron sheeting of thickness 1.63mm (16 gauges). For 3 cum plant of 12 feet depth the height of the drum approximately one-third the depth which become 4 feet. Make the diameter of the drum 6 inch less than that of the pit (5 feet diameter).

            Using a flange, attach a 1.5 inch pipe to the inside top center. Fix the lower end of the pipe firmly in place with thin, iron tie rods or angle iron. The cap now looks like a hollow drum with a pipe, firmly fixed, running through the center. Cut a ¾ inch diameter hole, as shown in Figure 7, in the top of drum for out let of gas. Weld a 3/4 inch diameter pipe over the hole. Paint the outside and inside of the drum with a coat of paint or tar.

            Make sure the drum is airtight. One way to check this is to fill it with water and watch for leaks. Attach handles to either side of the drum. These don't have to be fancy, but they will prove very helpful for lifting the drum off and for turning the drum.
Weld a metal strip to each of the tie rod supports in a vertical position. These "teeth" will act as stirrers. By grasping the handles and rotating the drum it is possible to break up troublesome scum that forms on the slurry and tends to harden and prevent the passage of gas.

K. Prepare the Mixing and Effluent Tanks

         
Build or improvise a mixing tank to be placed near the outside opening of the inlet pipe. Likewise, provide a container at the outlet to catch the effluent. Some provision may also be made for drying the effluent when the plant goes into full production. 



L. Operation

In order to start up the new digester, it is necessary to have 3 cubic meters (3000kg) of manure. Put the manure an equal amount of water into the mixing tank. Stir it into thick liquid called slurry. A good slurry is one in which the manure is broken up thoroughly to make a smooth, even mixture having the consistency of thin cream. If the slurry is too thin, the solid matter separates and falls to the bottom instead of remaining in suspension; if it is too thick, the gas cannot rise freely to the surface. In either case the output of gas is less. When filling the pit for the first time, pour the slurry equally into both halves to balance the pressure on the thin inner wall, or it may collapse.

            Mix 50 to 60kg fresh manure with same quantity of water and add it to the tank every day. The advantage of this model is that since the daily flow of slurry goes up the first side, where the insoluble matter rises, and down the second, where this matter naturally tends to fall, the outgoing slurry daily draws out with it any sludge found at the bottom. It can take four to six weeks from the time the digester is fully loaded before enough gas is produced and the gas plant becomes fully operational. The first drumful of gas will probably contain so much carbon dioxide that it will not burn.
            On the other hand, it may contain methane and air in the right proportion to explode if ignited.

M.  Test Gas Lines for Leaks 

            Checking for gas leaks is done by closing all gas taps, including the main gas tap beside the gas holder, except for one. Then to the open tap, a clear plastic pipe about a meter long is attached, and a "U" is formed. The lower half of the "U" is filled with water. Using a pipe attached to a second tap, pressure is applied until the water in the two legs of the "U" is different by 6 inch. The second tap is then closed.  If the water levels out when the second tap is closed, a leak is indicated and can be sought out by putting soapy water over possible leaks, such as joints, in the pipe work.

N.  Improved Stove 

            Because gas pressure is low, it will be necessary to modify existing equipment or build special burners for cooking and heating. A pressure stove burner will work satisfactorily only after certain modifications are made to the burner. The needle-thin jet should be enlarged to 1.5mm. To make a burner out of 1.5cm water pipe, choke the pipe with a metal disc having a center hole with a diameter of 1.5 to 2mm. An efficient burner is a tin can, filled with stones for balance, having six 1.5mm holes in the top.

            The gas enters through a pipe choked to a 2mm orifice. Or fill a chula or Lorena stove with stones and insert a pipe choked to a 2mm orifice. If possible, it is best to use a burner with an adjustable air inlet control. The addition or subtraction of air to the gas creates a hotter flame with better use of available gas.

O. Maintenance

            A digester of this type is almost maintenance free and has a life of approximately 25 years. As long as cow or other animal manure is used, there should be no problems.

 
Designed by : Muhammad Khaliq Rural Engineer SLBAP/LML
 Bio Gas plant  from Kitchen waste

Literature Study : Bio Gas from Kitchen waste

The Principle: Biomass in any form is ideal for the Biomethanation concept, which is the central idea of the Biogas plants. Based on thermophilic microorganisms and microbial processes develop the design of the biogas plant. The plant is completely gravity based. 


Brief process description: The segregated wet garbage (food waste) is brought to the plant site in bins and containers. It is loaded on a sorting platform and residual plastic, metal; glass and other non-biodegradable items are further segregated. The waste is loaded into a Waste Crusher along with water, which is mounted on the platform. The food waste slurry mixed with hot water is directly charged into the Primary digester.
This digester serves mainly as hydrolysis cum acidification tank for the treatment of suspended solids. For breaking slag compressed air is used for agitation of slurry. Compressed air will also help in increasing aeration since bacteria involved in this tank are aerobic in nature. The tank is designed in such a way that after the system reaches equilibrium in initial 4-5 days, the fresh slurry entering the tank will displace equal amount of digested matter from top into the main digester tank.
Main digester tank serves as a methane fermentation tank and BOD reduction takes place here. The treated overflow from this digester is connected to the manure pits. This manure can be supplied to farmers at the rate of 4-5 Rs. per Kg. Alternatively municipal gardens and local gardens can be assured of regular manure from this biogas plant.
The biogas is collected in a dome (Gas holder) is a drum like structure, fabricated either of mild steel sheets or fibreglass reinforced plastic (FRP). It fits like a cap on the mouth of digester where it is submerged in the water and rests in the ledge, constructed inside the digester for this purpose. The drum collects gas, which is produced from the slurry inside the digester as it gets decomposed and rises upward, being lighter than air. 1" GI piping will be provided up to a distance of 50 m from the Biogas plant. Biogas burners will be provided. The biogas can be used for cooking, heating and power generation purpose.


Cost details, saving and payback period from a biogas plant: The cost details and the savings envisaged from the plant are given in the following table. The life of the plant could be 20-30 years and payback period is 4-5 years.

MERU PRISON HUMAN WASTE BIOGAS PLANT

A PILOT PROJECT TO GENERATE BIOGAS USING HUMAN WASTE

The main objective of this project was to use the prisoners' waste to produce biogas that could be used as cooking fuel and cut down the cost incurred in buying of firewood initially used as fuel to cook for the prisoners.

However after completion, the project brought forth multiple benefits namely, treatment of the sewage waste in order to prevent waterborne diseases within the community, production of organic food for fish in the fish ponds, a cleaner environment realised through better sanitation practices thus ensuring that the prisoners do not fall sick as often as before.

The prison has 1,200 inmates and about 300 saffs and it's in the Eastern provinnce of our country Kenya.