Biogas Plant Construction in Afghanistan, Joint Engineer Directorate Fixed-dome Digester  Photo Gallery
Biogas Plant Construction in Afghanistan, Joint Engineer Directorate Fixed-dome Digester  Photo Gallery

INLET TANK FOR MIXING WATER AND MANURE (GOBAR)

Concrete Foundation for Digester.  Center Guide Pipe and Horizontal Cord.
BIOGAS LANTERN AMD BIOGAS DOUBLE BURNER STOVE



PLANT CONSTRUCTION
Earth Base of Excavation is Compacted BIOGAS PLAN
BIOGAS PLANT






COMPOST PITS WITH BRICK WALLS FOR STABILITY

INLET TANK DURING MASONRY CONSTRUCTION

INLET TANK

SLABS IN PLACE ON OUTLET CHAMBER

MANHOLE INSPECTION OF COMPLETE BIOGAS CHAMBER

OUTLET CHAMBER , FOUNDATION OF BRICK WITH MANHOLE ADJACENT TO DIGESTER

COMPLETE FIXED DOME WITH TURRET

MOULD WITH SAND LAYER BEFORE PLACING CAST

ARCH GUIDE, LOOP AT RIGHT END FOR PIVOT ON VERTICAL CENTRAL PIPE



First Two Courses of Bricks Placed on Top of Foundation.

First Two Courses of Bricks Placed on Top of Foundation.


Cobbles and Gravel Placed on Compacted Earth Floor.

Excavation for Digester.  Mechanical or Manual Excavation is Practical.

Excavation for Digester.  Mechanical or Manual Excavation is Practical.

Scale Model of 4 Cubic-Meter Biogas Plant for Training (Camp Nathan Smith,
Kandahar, Afghanistan)